The timeline is a Gantt view with dependency arrows. Drag to schedule work, then draw a link between two bars to set a dependency, and the arrow follows as dates move. You can pick the link kind and edit it after drawing.
العودة إلى الملاحظات
0
ميزةاللوحة والمهامتم الإطلاق
Timeline / Gantt with dependency arrows
Omar16/06/2026

أضف تعليقًا
ابدأ النقاش.